How to use Runway

Start with the build. Add the signals that decide whether it can happen.

You do not need to configure every module on day one. Start with product structure, dated demand and materials. Add work-cell standards and shift control when you want the same view to extend into execution.

Step 01Product + BOM
Step 02Build plan
Step 03Inventory + supply
Step 04+Cells + shifts + action
RunwayWhat is RunwayHow to usePricing
Quick start

Five steps to a useful material-readiness view.

This is the shortest path to value. Once these are in place, Runway can calculate shortages and show which build milestones are covered.

01

Products & BOM

Upload Excel/CSV using the template or start from scratch. Connect each part to the parent assembly that directly uses it.

02

Build plan

Add finished-unit quantities and due dates. This sets the demand Runway will test.

03

Inventory

Enter on-hand stock, reserved quantity, safety stock, stock unit and conversion where needed.

04

Incoming supply

Add expected receipts, optional PO numbers and due weeks aligned to build-plan milestones.

05

Review shortages

Use production outlook, readiness Gantt and highest-impact risks to decide what needs action first.

Guided workspace

See the workflow by responsibility.

Click through the four operating perspectives below. Each one shows the part of Runway that role is expected to maintain.

RUNWAY · GUIDED VIEW
Planning · Products & BOM
ITEMROLEQTY / PARENTSUPPLY
DESK-100 · Finished productProduct1 EAIn-house
FRAME-ASSY · FrameAssembly1 EAIn-house
BRKT-220 · Mount bracketPart4 EAPurchased
CABLE-01 · Power leadPart1 EAPurchased
Process Owner · Work cells & standards
01 · Fabrication
02 · Controls
03 · Final assembly
PROCESS STEPSTD TIMEMIN CREWMAX USEFUL
Install lift columns4.8 min12
Route harness3.6 min11
Functional test5.2 min11
Supervision · Shift control
Operator 01Steps 1–2
Operator 02Steps 3–4
Operator 03Steps 5–6
DOWNTIME12 min
SCRAP3 units
CHANGEOVER8 min
SHIFT OEE81%
Operations Leadership · Risks and action
Bracket shortage · 18 units blockedHigh impact · Sep 14 milestone
Cell 03 crew below practical targetManpower · Current shift
Fixture repeatability issueTeam-raised · Owner assigned
Incoming motor kits delayedSupply · Receipt Sep 12
Setup detail · BOM

Build the hierarchy correctly first.

Every BOM needs one finished-product row. Each child item points to the part number one level above it. Quantity per parent means the quantity used by one parent, not the total requirement across the full build.

1
Structure roleFinished Product, Assembly, Individual Part or Bulk Material.
2
Supply methodPurchased or Made in-house is separate from the item’s structural role.
3
ConversionUse it when stock is held in a different unit from the BOM requirement.
PART NUMBERPARENTROLEQTY
WIDGET-100ROOTFinished product1 EA
SUB-AWIDGET-100Assembly1 EA
PART-001SUB-AIndividual part2 EA
RAW-001SUB-ABulk material0.8 m
Then extend into execution

Add work cells when you want readiness to reach the floor.

Create the work area, assign its owner, define standard steps and attach its controlled references. Once those standards exist, supervisors can use them for operator balance and dated shift records.

01
Create the cellEstablish the operating area and ownership.
02
Define process stepsSet standard time and practical crew limits.
03
Attach documentsLink SOPs, safety, quality and drawing references by work cell.
04
Run the shiftBalance people, record actuals, downtime, scrap and notes.
SetupCreate cell
StandardProcess steps
BalanceAssign crew
ActualRecord shift
What to review every day

Use Runway as an operating cadence, not just a setup exercise.

A practical daily rhythm is to review the production outlook, open constraints, work-cell status and the latest shift record, then update supply or roadblock ownership as conditions change.

MORNING

Check dated coverage and highest-impact risks.

Look first at what is controlling the next build milestone.

SHIFT

Balance the crew and record actual performance.

Use downtime and output records to keep the execution picture current.

ACTION

Close the loop on roadblocks.

Assign ownership, preserve context and resolve flags when the constraint is genuinely cleared.

Ready to try the flow?

Start with one product and one build milestone.

That is enough to see how Runway turns product structure, stock and incoming supply into a production-readiness decision.